Construction Method: Multi-Mall Method
The multi-mole method is a mechanized technique for horizontal thrusting and vertical excavation work during the installation of sewer connection pipes and public manholes.
During the installation of sewer connection pipes and public manholes, it is necessary to dig horizontal and vertical holes. However, due to the complex site conditions, the current situation relies heavily on manual labor, making labor-saving at the site a pressing issue. The Multi-Mole method utilizes "TonTon-kun" and "BuruBuru-kun" to mechanize horizontal pushing and vertical excavation. In addition to standalone use, it also allows for the joining of horizontal and vertical operations. The Multi-Mole method significantly improves not only labor-saving but also safety and construction quality.
- Company:光和商事株式会社
- Price:Other